azerbaijan-micro-tunnel-project
Project Specifications
Country, city :Azerbaijan
Year of construction :2015
Stock :Urban sewage
Geology :Clay
Mechanical data :
Client :Azarsu Co
Description :Contractor: TamirTekini
Device Specification :
Device size : 800 mm device type : Slurry Micro TBM Manufacturer : MTS Year of construction : 2007 Other technical specifications :

project-uma-oya-in-sri-lanka
Project Specifications
Country, city :Sri Lanka
Year of construction :2013
Stock :Water Transfer for water Power Plant
Geology :
Mechanical data :Tunnel length: 3.5 km
Client :Farab Co
Description :Contractor: Ktb Consulting – Consultant: MahabGhodss
Device Specification :
Device size : Diameter: 4.2 meters device type : Hard Rock Double Shield Manufacturer : Herrenknecht Year of construction : 2012 Other technical specifications :

qatar-sewage-network-project
Project Specifications
Country, city :Qatar, Doha
Year of construction :2018
Stock :Sewage Network
Mechanical data :
Client :Ashghal
Description :
Device Specification :
Device size : 2040mm device type : AVN 1600 Manufacturer : Herrenknecht Year of construction : 2009 Other technical specifications :

Oil Pipeline Crossing
Description: HDD project for a 24-inch oil pipeline under a waterway in Duqm.
Key Points:
2,000-meter crossing in mixed soil with rocky patches.
Completed in 2 months using sub-site electronics.
Benefits: Reduced environmental impact, cost-effective for long crossings.

Telecommunications Cable Installation
Description: Micro-trenching for fiber optic cables along 5 km of urban sidewalks.
Key Points:
Narrow 1.5-inch trenches, 18 inches deep, completed in 1 month.
Stable urban soil, minimal restoration needed.
Benefits: Rapid deployment, cost-effective, minimal urban disruption.

Cable Installation
Precision: ±10 mm accuracy for complex urban projects.
Minimal Disruption: Only requires pits, preserving infrastructure.
Safety: Remote operation reduces worker risks.
Versatility: Works in diverse ground conditions.
No Secondary Lining: Lowers costs and speeds up projects.

Oil Pipeline Crossing
Description: HDD project for a 24-inch oil pipeline under a waterway in Duqm.
Key Points:
2,000-meter crossing in mixed soil with rocky patches.
Completed in 2 months using sub-site electronics.
Benefits: Reduced environmental impact, cost-effective for long crossings.

Telecommunications Cable Installation
Description: Micro-trenching for fiber optic cables along 5 km of urban sidewalks.
Key Points:
Narrow 1.5-inch trenches, 18 inches deep, completed in 1 month.
Stable urban soil, minimal restoration needed.
Benefits: Rapid deployment, cost-effective, minimal urban disruption.

Cable Installation
Precision: ±10 mm accuracy for complex urban projects.
Minimal Disruption: Only requires pits, preserving infrastructure.
Safety: Remote operation reduces worker risks.
Versatility: Works in diverse ground conditions.
No Secondary Lining: Lowers costs and speeds up projects.